page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40 page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
< prev - next > Energy Mechanical Power tech_guidelines_gravity_goods_ropeway (Printable PDF)
GRAVITY GOODS ROPEWAY
7 Execution and
Installation
7.1 Layout
Before laying out the ropeway site,
clearance should be done as a part
of any site preparation. However, it is
already indicated in earlier chapters
that the ropeway alignment should be
chosen in such a way that there is no
or minimum damage to the existing
ecology which includes clearing off
the trees, rocks and soil.
For layout, set the theodolite at
permanent peg point of either upper
station (A) or bottom station (B). Then
sight another permanent peg at another
station and set zero. Then transit the
theodolite and locate a point well
beyond the estimated location of outer
wall of the anchorage block and fix a
peg firmly. Now, rotate the theodolite
90 degrees in a horizontal plane, and
locate another point at few metres
distance from the side wall of the shed
and secure a peg. Then again, transit
the theodolite to find a point few
metres distance from the outer wall
of the shed on the other side and fix
another peg after which the horizontal
and lateral reference lines perfectly
A
Figure 18
Figure 19
32
step 1
B
step 2